|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
 |
 |
| |
We profoundly consider quality, as the way of doing production, rather than the product itself. In order to improve our overall quality to a more advanced level, our company launched a new Total Quality Management (TQM) campaign in 2003. As a result, we have been integrated every single manufacturing procedure into our TQM frame since then. |
|
|
|
|
|
|
| |
 |
 |
|
| ① Raw Material Inspection |
| Every single TFT panel and electronics component should be carefully inspected and filtered. Any defect or inferiority will be denied and returned back to the supplier. |
| ② Final Examination |
| All finished products should undertake a 24-48 hour aging procedure before
FinalExamination. We inspect the performance of
tuning, display quality, component stability, and
packing, and also comply with the customers' requirements
and instructions. |
|
|
| |
|
|
| |
We devote extra quality inspection points to the whole production line. Thus, preventing any defects flowing into the next tier of our production chain, achieving Defect-Prevention quality control.
Precision and criticism are our working principles.
|
|
|
 |
| |
|
|
|
|